UNAMI - PV Project / D2 Site . We have successfully installed, tested and energized a 650.325 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in D2, Baghdad - Iraq. This advanced system features a 625 KW PV inverter in a three-phase configuration, a 1080 KWh Battery Energy Storage System, and a 500 KW Power Conversion system. The system comprises 1,131 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Five (5) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System (PowerCube-M2A-180), with a total capacity of 1,080 KWh (108 KWh per rack, across 10 battery racks), including BMU, BMS, HMI, battery combiner panel with fuses, battery cables, and all necessary accessories, • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS500K-A, with a max DC input voltage of 1000V, DC input range of 500V-900V, rated AC output power of 500 KW, and max output current of 794A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 69 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.


- Name of Project / Kind of Works:   UNAMI - PV Project / D2 Site . We have successfully installed, tested and energized a 650.325 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in D2, Baghdad - Iraq. This advanced system features a 625 KW PV inverter in a three-phase configuration, a 1080 KWh Battery Energy Storage System, and a 500 KW Power Conversion system. The system comprises 1,131 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include: • On-Grid PV Inverter: Five (5) 125KW-1000 VDC three-phase on-grid string inverters, • Energy Storage System: LFP Lithium-Ion Energy Storage System (PowerCube-M2A-180), with a total capacity of 1,080 KWh (108 KWh per rack, across 10 battery racks), including BMU, BMS, HMI, battery combiner panel with fuses, battery cables, and all necessary accessories, • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS500K-A, with a max DC input voltage of 1000V, DC input range of 500V-900V, rated AC output power of 500 KW, and max output current of 794A, including HMI. • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units, • PV DC Combiner Box: 69 units of DC1500V 1in/1out, with a protection rating of IP65. The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.
- Total Value of the Contract:  
- Duration:  
- Commencement Date:   03/03/2023
- Completion Date:   15/07/2024
- Status of Project Completion:   100%
- Contracting Authority and Location:   United Nations Assistance Mission for Iraq (UNAMI)
- Prime Contractor (P) or Subcontractor (S):   P
- NPC Responsibility:   Design, engineering services, delivery of equipment and materials to the sites, carrying out sites civil, mechanical and electrical installation works, testing, commissioning and energizing.
- Description:  

We have successfully installed, tested and energized a 650.325 KWp rooftop mounting Solar PV Hybrid Microgrid System at the UNAMI Compound BGZ, located in D2, Baghdad - Iraq. This advanced system features a 625 KW PV inverter in a three-phase configuration, a 1080 KWh Battery Energy Storage System, and a 500 KW Power Conversion system.

The system comprises 1,131 JINKO SOLAR PV modules (Tiger Neo N type Mono-crystalline 72HL4-(V) 575 Watt), securely mounted on a galvanized steel structure with precast concrete block footings. Key components of this installation include:

  • On-Grid PV Inverter: Five (5) 125KW-1000 VDC three-phase on-grid string inverters,
  • Energy Storage System: LFP Lithium-Ion Energy Storage System (PowerCube-M2A-180), with a total capacity of 1,080 KWh (108 KWh per rack, across 10 battery racks), including BMU, BMS, HMI, battery combiner panel with fuses, battery cables, and all necessary accessories,
  • Power Conversion System: Three-Phase Energy Storage Converter (Isolated Type) BCS500K-A, with a max DC input voltage of 1000V, DC input range of 500V-900V, rated AC output power of 500 KW, and max output current of 794A, including HMI.
  • Energy Management System (EMS), Control & SCADA System: Responsible for monitoring, controlling, and managing power distribution across multiple energy storage units,
  • PV DC Combiner Box: 69 units of DC1500V 1in/1out, with a protection rating of IP65.

 

The installation also encompassed the Control and Power Room, equipped with an HVAC system, Power Distribution Board, and a complete set of cables (AC, DC, Earth, and Communication), along with all necessary accessories to ensure robust connectivity and safety. Furthermore, the project included the construction of grounding and lightning protection systems.

 